Sign in
Author
|
Conference
|
Journal
|
Organization
|
Year
|
DOI
Look for results that meet for the following criteria:
since
equal to
before
between
and
Search in all fields of study
Limit my searches in the following fields of study
Agriculture Science
Arts & Humanities
Biology
Chemistry
Computer Science
Economics & Business
Engineering
Environmental Sciences
Geosciences
Material Science
Mathematics
Medicine
Physics
Social Science
Multidisciplinary
Related Publications
(64)
Scheduling : theory, algorithms, and systems
Online Scheduling to Minimize Average Stretch
Approximating total flow time on parallel machines
Task Allocation in Distributed Data Processing
Approximation Algorithms for Average Stretch Scheduling
Subscribe
Academic
Publications
Introduction to Sequencing and Scheduling
Introduction to Sequencing and Scheduling,Kenneth R. Baker
Edit
Introduction to Sequencing and Scheduling
(
Citations: 1200
)
BibTex
|
RIS
|
RefWorks
Download
Kenneth R. Baker
Published in 1974.
Cumulative
Annual
Citation Context
(426)
...(
1967
) and Baker (
1974
), there are many works in this research field...
Hermann Lödding
,
et al.
Modelling lateness and schedule reliability: how companies can produce...
...A useful distinction related to the lateness performance indicator, already mentioned in the seminal work of Baker (
1974
), is the subdivision into average lateness and variance of lateness...
G. D. Soepenberg
,
et al.
A framework for diagnosing the delivery reliability performance of mak...
...Also, it may reflect the assembly environment in which components should all be ready at the same time in order to avoid staging delays (Baker
1974
)...
Jun-Gyu Kim
,
et al.
Fast and meta-heuristics for common due-date assignment and scheduling...
...The set of all active schedules is a dominant set of schedules for the regular measure of performance such as flowtime, tardiness, and lateness (Baker
1974
)...
Yao-Hsiang Dong
,
et al.
Production rescheduling for machine breakdown at a job shop
...With non-delay scheduling no machine is kept idle when it could begin processing some operation (Baker
1974
)...
Boris Shnits
.
Multi-criteria optimisation-based dynamic scheduling for controlling F...
Sort by:
Citations
(1200)
Modelling lateness and schedule reliability: how companies can produce on time
Hermann Lödding
,
Peter Nyhuis
,
Matthias Schmidt
,
Arif Kuyumcu
Journal:
Production Planning & Control - PRODUCTION PLANNING CONTROL
, vol. ahead-of-p, no. ahead-of-p, pp. 1-14, 2012
A framework for diagnosing the delivery reliability performance of make-to-order companies
G. D. Soepenberg
,
M. J. Land
,
G. J. C. Gaalman
Journal:
International Journal of Production Research - INT J PROD RES
, vol. ahead-of-p, no. ahead-of-p, pp. 1-17, 2012
Fast and meta-heuristics for common due-date assignment and scheduling on parallel machines
Jun-Gyu Kim
,
Ji-Su Kim
,
Dong-Ho Lee
Journal:
International Journal of Production Research - INT J PROD RES
, vol. ahead-of-p, no. ahead-of-p, pp. 1-18, 2012
Production rescheduling for machine breakdown at a job shop
Yao-Hsiang Dong
,
Jaejin Jang
Journal:
International Journal of Production Research - INT J PROD RES
, vol. 50, no. 10, pp. 2681-2691, 2012
Multi-criteria optimisation-based dynamic scheduling for controlling FMS
Boris Shnits
Journal:
International Journal of Production Research - INT J PROD RES
, vol. ahead-of-p, no. ahead-of-p, pp. 1-11, 2012